Loading articles...

Wide load scheduled to travel through Thickwood Sunday

PHOTO. Jubilee Centre. Sarah Anderson. REPORTER.

The municipality is advising residents of a wide load that’s scheduled to move through Thickwood overnight Mar. 18.

The load is scheduled to move from the juncture of Highway 63 and Thickwood Boulevard to Tower Road between 10 p.m. Mar. 18 and 6  a.m. Mar. 19.

Drivers and transit riders could experience delays and detours along Thickwood Boulevard during this time frame due to traffic and short-term intersection closures.